$349M Hope Canal bridge commissioned

 

The East Demerara Water Conservancy’s (EDWC), Hope Canal Project will boost food security and foster other developments for Guyana, President Donald Ramotar underscored at the commissioning of the long-awaited Hope Canal Bridge, component two of the Hope Canal Project.

 

He was joined by Minister of Agriculture Dr. Leslie Ramsammy, Minister of Public Works Robeson Benn and Chief Executive Officer (CEO) National Drainage and Irrigation Authority (NDIA) Lionel Wordsworth, and several other Government Ministers.

 

President Donald Ramotar looks on as a Hope Secondary School student cuts the ribbon to commission the Hope Canal Bridge

President Donald Ramotar looks on as a Hope Secondary

School student cuts the ribbon to commission the Hope

Canal Bridge

 

Economic and humanitarian benefits

 

“This is only part of total infrastructure projects that we are planning in our country…for us really to have rapid economic growth and for us to improve the quality of our lives, we have to invest in infrastructure to facilitate and encourage economic development and so this is part of that whole project,” the President told the Region Four residents gathered.

 

The Head of State pointed out that the project, which was conceived after repeated flooding was experienced in the area, has importance from an economical, as well as humanitarian stand point.  “I myself have gone in those areas in times when there were floods, and I could attest to the way it wrenched our hearts, you will be less than human if you went to see the condition that the people were in, water flooding their homes. I remember going at one time and speaking to people right up to their step from a boat,” he said.

 

President Donald Ramotar leads the procession up the Hope Canal Bridge

President Donald Ramotar leads the procession up the Hope

Canal Bridge

 

Farmers

 

The President said what was more impacting was seeing farmers, some of the hardest working people in the world, putting in their labour and having to continuously witness it being destroyed or see their animals lost. “It was those conditions that formulated the ideas that we had to do something, because we had to make the choice of releasing water into the MMA, knowing full well that it will destroy people’s farms, but the alternative to that was having the pressure on the walls break and flood the whole coastal area..” he said.

 

Reducing the impact of the flooding on the farmers’ crops, also helped to improve production and productivity, which is extremely important, given the global issue of food security, the President said.

 

The commissioning of this phase of the project also addresses the issue of providing improved infrastructure for the growing number of vehicles that now traverse Guyana.

 

He expressed the hope that the other three components of the project will be accelerated, so that the entire transformational project can come on stream.

 

Following the floods of 2005 and more so in 2008, government through the NDIA explored the previous options of re-introducing relief measures to maintain a safe conservancy water level in militating against hydrological storms, particularly rainfall, resulting in water level rising above the safe threshold.

 

Residents of Hope look on as the first set of vehicles takes the inaugural trip over the Hope Canal Bridge

Residents of Hope look on as the first set of vehicles takes

the inaugural trip over the Hope Canal Bridge

 

NDIA

 

The NDIA was tasked with putting together a plan to undertake the necessary hydrological and hydraulic studies and an Environmental Management Plan. Through public bidding, a consultancy contract was awarded to CEMCO/SRKN Engineering in association with Mott Mc Donald to the value of $64M, and which spanned a period of 14 months. Concurrently during this period, several consultations were held with stakeholders and a technical oversight team put in place to review reports from the consultant. Following acceptance of the design for each of the four components, bids were launched for the construction works and supervision services.

 

For the public bridge, the successful bidder was DIPCON at the contract sum of $349,654, 353, and the company commenced work on the bridge in August 8, 2011. The project was expected to be completed on February 4, 2013, but suffered two extensions, bringing the final date of November 30, 2013. The project duration of 18 months had to be revised to 27 months.

 

The Hope Canal Bridge

The Hope Canal Bridge

 

Guyanese

 

Minister Ramsammy said that the project in its entirety deserves celebration by all, for the reason that it was a signal achievement for Guyana, coming forward as a result of Guyanese intervention. He noted that the design was done by a Guyanese company, and whilst DIPCON Construction is a Trinidadian company, it has become much like a Guyanese company. “Guyanese engineers, Guyanese workers have constructed the Northern Relief Channel and this first component that is opening for vehicular traffic was done by Guyanese workers, and if we cannot celebrate that together, something is definitely wrong with us,” he said.

 

He noted that Guyanese too must be proud of it for the reason that it is a climate change adaptation project and it testimony to Guyana not only acknowledging climate change, but as well doing something about it. “When all is said and done, the Northern Relief Channel at Hope will be recorded as a significant input that Guyana has made to climate change in our country,” he said.

 

Minister Benn congratulated the Ministry, the NDIA, the engineers, the contractors and labourers for successfully bringing that component of the project to completion. He said it will ensure Guyana continues to optimise its food production by reducing the risk of flooding in the Mahaica/Mahaicony/Abary (MMA) areas.

 

He particularly recognised DIPCON, for being a ‘reliable development partner in Guyana’ for 19 years especially on construction work, moreso roads and bridges. “They have been with us for the long haul over all of these years, and their effort in Guyana really has to be recognised, whilst we have gone through the ups and down of developing our country, all of these years,” Minister Benn said.

 

Guyanese engineers and workers are learning more, and are become more formalised on the issues of safety and engineering excellence.  The bridge is a single example as to how they can and are growing in terms of expertise and delivery.

 

Challenges

 

The project faced many challenges during the construction phase. Wordsworth explained that during the pile driving phase, the position of the crane was a challenge due to limited working area on the western pier especially during the driving of the raking pile.

 

He said too, that the contractor originally said in their work proposal that the concrete beams for the bridge would be cast at DIPCON’s Owerwagt Plant, however it turned out only the bearing piles and the 17.5m short piles could have been cast. “The longest 40m beans were considered too heavy, and there was no available truck capable to transport the long span beam. Also it was determined to be impossible to be traversed around some of the turns on the main roadway, between the plant yard and the site, and as such much more time had to be spent on site preparation work,” explained. There was also period of brief delay due to the inadequate supply of aggregate for casting of concrete works.

 

The bridge has a length of 74.4m and a 47m sloped approach on both sides. As part of quality control as per contract and standard engineering guideline, Geotec Associates  of Trinidad and  Tobago was hired to conduct four tests on the pre-stressed concrete piles, to confirm the allowable bearing load for the foundation. Additionally some concrete samples were taken among the concrete cylinders, taken for laboratory testing for further analysis by another Trinidadian firm. The jack used to stress the strands in the 40m beams in the span was calibrated by the Guyana National Bureau of Statistics (GNBS) and personnel from Dywidag on the part of the contractor.

 

Immediately after the commissioning of the bridge, the structure was opened to traffic. The road diversion which vehicles were using to traverse the East Coast Highway in the vicinity of Hope will now be closed to facilitate the remaining works towards bringing the other components of the project to fruition.

 

The bridge has a 12-month defects liability period, which commences from today.

 

Also in attendance at the ceremony were Minister of Health Dr. Bheri Ramsaran, Minister of Labour Dr. Nanda Gopaul, Minister of Culture Youth and Sport Dr. Frank Anthony, and Minister in the Ministry of Finance Juan Edghill.

Replies sorted oldest to newest

The Head of State pointed out that the project, which was conceived after repeated flooding was experienced in the area, has importance from an economical, as well as humanitarian stand point.  “I myself have gone in those areas in times when there were floods, and I could attest to the way it wrenched our hearts, you will be less than human if you went to see the condition that the people were in, water flooding their homes. I remember going at one time and speaking to people right up to their step from a boat,” he said.

 

What a compassionate, caring and humane President Guyana is lucky to have. With Leaders like that a Nation is blessed.

Nehru
Originally Posted by KishanB:
Originally Posted by Mitwah:

Is how many threads we gonna get on this bridge?

 

https://guyana.crowdstack.io/topic/pp...2#376363251957595892


Mits, you got these PPP fool confuse, they getting stupidee.

 

LOL

Draw wan Picha of the Bridge and remember to stay within the line, meh am wisd nice colors and thing.

Nehru
Originally Posted by BGurd_See:

Ramo and the PPP should be on high alert as the KFc are undoubtedly working on plans to sabotage this bridge and derail the project.  

Not long from now you will see someone try to burn it down.

FM
Originally Posted by skeldon_man:
Originally Posted by BGurd_See:

Ramo and the PPP should be on high alert as the KFc are undoubtedly working on plans to sabotage this bridge and derail the project.  

Not long from now you will see someone try to burn it down.

Let's hope that does not happen. I really like the pedestrian walkway on the side. I wonder why they did not have this on the Berbice bridge?

Mitwah
Originally Posted by Mitwah:
Originally Posted by skeldon_man:
Originally Posted by BGurd_See:

Ramo and the PPP should be on high alert as the KFc are undoubtedly working on plans to sabotage this bridge and derail the project.  

Not long from now you will see someone try to burn it down.

Let's hope that does not happen. I really like the pedestrian walkway on the side. I wonder why they did not have this on the Berbice bridge?

It's the best thing PPP did for the people on the other side of the Berbice river.

FM
Originally Posted by Demerara_Guy:
Originally Posted by Nehru:

In fact, because of this Project you can compare the PPP to Moses parting the Red Sea.

Now Nehru .. which Moses? 

Not the one on the Video at Albion.

Nehru
Originally Posted by Demerara_Guy:
Originally Posted by Nehru:

In fact, because of this Project you can compare the PPP to Moses parting the Red Sea.

Now Nehru .. which Moses? 

Dis bai nearly mek me pee ah me pants just now. Me tink dis man ah jain de AFC.

FM
Originally Posted by Nehru:
Originally Posted by Demerara_Guy:
Originally Posted by Nehru:

In fact, because of this Project you can compare the PPP to Moses parting the Red Sea.

Now Nehru .. which Moses? 

Not the one on the Video at Albion.

Okay, thanks for the identification. 

FM

Add Reply

×
×
×
×
×
Link copied to your clipboard.
×
×